• Home
  • Forms
  • Tax Assessor
  • Town Clerk
  • Town Directory
  • Pay Online
  • Meetings
  • Flood Damage Assessement
  • Land Dev Sub Regs
  • More
    • Home
    • Forms
    • Tax Assessor
    • Town Clerk
    • Town Directory
    • Pay Online
    • Meetings
    • Flood Damage Assessement
    • Land Dev Sub Regs
  • Sign In
  • Create Account

  • My Account
  • Signed in as:

  • filler@godaddy.com


  • My Account
  • Sign out

Signed in as:

filler@godaddy.com

  • Home
  • Forms
  • Tax Assessor
  • Town Clerk
  • Town Directory
  • Pay Online
  • Meetings
  • Flood Damage Assessement
  • Land Dev Sub Regs

Account


  • My Account
  • Sign out


  • Sign In
  • My Account

Town of Johnston, Rhode Island

Town of Johnston, Rhode IslandTown of Johnston, Rhode IslandTown of Johnston, Rhode Island

engineering division

The Engineering Division includes the Sewer Inspection Division, the Geographic Information system (GIS) and is responsible for review of information regarding designs and specifications for the construction of various projects throughout the Town. This Department also provides inspection of the projects during construction to ensure compliance with Town standards. The Sewer Inspector will inspect sewer line repairs and maintain critical sanitary sewer data such as new connections, infrastructure updates, and record map accessibility.

Questions?

Call the Department of Development and Public Services ar 401-231-4000

Downloads

Appendix A - Existing Conditions Plan (pdf)Download
Appendix B - Acquisition Agreement (pdf)Download
Appendix C - Figures from 2007 Comprehensive Plan (pdf)Download
Appendix D - NBC Fields Point RIPDES Permit (pdf)Download
Appendix E - Plan of Apparent System Deficiencies (pdf)Download
Appendix F - Phased Buildout Project Plans - 0-5 yr time horizon revised 5.28.10 (pdf)Download
Appendix F - Phased Buildout Project Plans - 5 - 10 yr time horizon (pdf)Download
Appendix F - Phased Buildout Project Plans - 10 - 20 yr time horizon revised 5.28.10 (pdf)Download
Appendix G - Wastewater Flow Projects - Final-0-5 year build-out (pdf)Download
Appendix G - Wastewater Flow Projects - Final-5-10 year build-out (pdf)Download
Appendix G - Wastewater Flow Projects - Final-10-20 year build-out (pdf)Download
Appendix G - Wastewater Flow Projects - Final-Johnston South_2008FlowData_WithRIRRC_rev060310 (pdf)Download
Appendix G -Wastewater Flow Projects - Final-Johnston North_2008FlowData (pdf)Download
Appendix H - Johnston Enabling Legislation (pdf)Download
Appendix I - Sewer System Evaluation Study - Figure2-1 (pdf)Download
Appendix I Sewer System Evaluation Study Part 1 (pdf)Download
Appendix I Sewer System Evaluation Study Part 2 (pdf)Download
Appendix J - ADS Flow Monitoring eport - Part 1 (pdf)Download
Appendix J - ADS Flow Monitoring Report - Part 2 (pdf)Download
Appendix K - Final-Intergovnmental Review Comments - Public Particpation Information (pdf)Download

WASTEWATER FACILITY PLAN UPDATE (PART 1 OF 3)

Download PDF

WASTEWATER FACILITY PLAN UPDATE (PART 2 OF 3)

Download PDF

WASTEWATER FACILITY PLAN UPDATE (PART 3 OF3)

Download PDF

Copyright © 2025 Town of Johnston - All Rights Reserved.

  • Home
  • Mayors's Opioids Page

Powered by

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

Accept